We are currently working with Manteena on a second project at The Canberra Hospital. Wainwright Facades is installing 1400m2 of Vitraloc cladding, 180m2 of Proclad Solid and 185m2 of Louvres at the ICU expansion project.
This project will increase ACT’s critical care capacity of the existing ICU from 31 to 39 beds. It is a challenging project as it requires the existing ICU, which occupies part of the third floor of Building 12, to remain fully operational throughout the construction period.
Comentarios